男人天堂av网站_看国产黄色大片_亚洲女同成av人片片在线观看_亚洲精品永久中文字幕_欧美性猛交xxxx乱大交91_婷婷久久无码欧美人妻

NewsHome > News > News Information

Requirements of Continuous Bridge Deck Paving on Curb Slipform Paver
release time:2020-5-30 10:17:16      hit count:1873

In order to realize continuous pavement of bridge deck by curb slipform paver, it is one of the necessary conditions to ensure the construction machinery and equipment that can pave the bridge deck.  First of all, the lateral formwork on the kerbstone slip-form paver can meet the requirements of the thickness of the thin reinforced concrete surface layer on the bridge deck, and the continuous steel bars, hanging ring steel bars, steel mesh, expansion joints and expansion joints on the bridge are proofread, which may block the slip of the lateral formwork of the kerbstone slip-form paver.  In particular, the blocking and advantage of the transverse complete continuous steel mesh on the bridge deck is that the movable height of the side formwork is only 5cm. Therefore, the side formwork must be a movable lifting type side formwork, which can be lifted to a zero position flush with the extrusion plate.  If there is a lengthened side formwork hanging behind the machine, it must also meet the thickness requirements of the paved bridge deck.

壓縮600.jpg

The bridge deck pavement of some expressways in our country has been damaged in a very short period of time. One of the most important reasons is that the thickness difference between the longitudinal and transverse pavement layers is too large. The longitudinal pre-stressed reverse arch is too large, some of which are more than 5cm and not less than 3-4 cm after pavement.  Transverse in precast reinforced concrete beam, not in the flange plate precast transverse slope, in the beam transverse flange plate between the wet joint, there is a transverse 2-4cm steps, in this case, the beam itself is not balanced in the vertical and horizontal direction, loss of pavement thickness of 2-4cm.  From the perspective of construction control, the minimum pavement thickness is 20cm, which is of great value to ensure the quality of actual bridge deck pavement.


During the construction process, the walking position of the planned kerbstone slipform paver for bridge deck pavement should be reserved, especially for central isolated expressways and grade I highway bridges.  First of all, the crawler of the two-lane large kerb slipform paver cannot travel in the central isolation and emptying position, nor at the outer edge of the main girder flange plate.  Secondly, the bridge engineering should divide the bridge deck paving work into kerbstone slipform pavers for road surface construction. At the same time, the guardrails on the bridge must be made after the kerbstone slipform pavers pave the bridge deck. Otherwise, the bridge railings will block the tracks of the kerbstone slipform pavers and have no paving position.


Previous: No more
Next: No more

Back to list

News you are interested in
主站蜘蛛池模板: 人妻精品动漫H无码专区 | 文豪野犬四季免费 | 国产成人亚洲综合色影视 | 日本末发育嫩小xxxx | 婷婷成人综合激情在线视频播放 | 日日躁夜躁aaaaxxxx | aaaa国产欧美大片免费看在线 | www.成人亚洲 | 国产在线专区 | 亚洲高清视频一区二区三区 | 久久午夜国产精品 | 免费在线黄色片 | 亚洲精品色哟哟 | 亚洲最大成人网4388xx | 成本人h片动漫网站在线看 a毛片免费精品一区二区三区 | fc2成人免费人成在线观看播放 | freeeⅹxx性欧美hd护士 | 狠狠av | 99久无码中文字幕一本久道 | 国产亚洲精品九九久在线观看 | 在线岛国av| 国产一区二区三区自拍 | 亚洲精品久久久蜜桃网 | 成年女人A毛片免费视频 | 在线观看啊啊啊啊啊 | 亚洲AV人人爽人人夜蜜桃 | 男人j桶进女人p无遮挡免费的视频 | 日本黄网站三级三级三级 | 精品国产鲁一鲁一区二区张丽 | 亚洲日韩精品欧美一区二区一 | 国内精品久久久久久久影视蜜臀 | 亚洲视频一区二区三区在线观看 | 欧美在线一区二区三区四区 | 五月天综合久久 | 免费观看污污视频 | 久久国产精品影院 | 亚洲无人区码二码三码区别 | 乱世佳人在线观看 | 有求必应呼叫中心在线观看 | 亚洲乱码av中文一区二区 | 91国内精品|